TRAFFIC ALERT: Roadway Construction at Galveston Cruise Terminals Will Cause Backups Port of Galveston officials said Monday (8/4/2025) that roadwork has started to improve traffic and pedestrian flow at cruise terminals 25 and 28. While the roadwork will be within the port on Wharf Road, traffic congestion on Harborside Drive and 23rd through 25th Street will likely increase when cruise ships embark and debark passengers. Crews will begin construction in early August on a section of port roadway that extends from the 23rd Street cruise complex entrance east for about 80 feet. A portion of the north lane will be under construction until early September. There will not be a traffic pattern change during that construction phase, but it will cause backups affecting roadway traffic outside the port. “The construction is part of a phased port project to improve vehicular and pedestrian safety on the port’s 2-mile-long Wharf Road,” port officials said in a media release. “The internal roadway expansion is also intended to help alleviate traffic congestion on Harborside Drive. More information about the project can be found by clicking the INFO button.
Posted by i45NOW at 2025-08-05 11:48:20 UTC